Cost-Plus vs. Fixed Price: Picking the Contract That Fits the Job
Fixed price, cost-plus, GMP, time and materials. Who carries the risk under each, what the owner gets to see, and which one fits which custom-home job.
Revenue Rx · Field Notes
What we build, what it produces, and what we would tell you across a table. No content calendar filler.
Fixed price, cost-plus, GMP, time and materials. Who carries the risk under each, what the owner gets to see, and which one fits which custom-home job.
How a construction draw schedule should be built: milestones vs. percent complete, the lender's inspection, the draw request, and the gap nobody totals.
What a construction change order has to carry, when it gets signed, and why the form matters less than the rule that nothing changed gets built first.
The construction contracts a builder needs after the bid is won, in the order money moves, and what the build agreement must carry before anyone signs it.
A one-hour lost bid analysis you can run the same afternoon: nine questions, what an honest unknown tells you, and the fix list in the order it pays.
Builders lose on price less often than they think. Where the losing number was built, what the client read it against, and what the second reader saw.
Construction bid follow up without the salesman feeling: what a link reports that a PDF can't, a cadence that stops at five, and one real call by a person.
Bids out divided by bids signed. Why almost nobody keeps both numbers, how to measure a contractor bid win rate honestly, and what it says about the bid.
Why contractors lose bids: the reader who never saw the lot, the silence after Friday, three packets that look alike, and a site that undercut the number.
How long it takes to get a construction bid, where the three weeks actually go, and what a five-day bid changes about the sale.
One honest 3D rendering of the client's actual house changes who reads a bid and how. What it does, what it must never do, and what it costs.
Four words builders use for the same four pages. Each one means something different once it is signed, and the signature line decides which one you sent.
A construction proposal template in twelve pages, in the order a homeowner reads them, the omissions that lose bids marked, and what no template covers.
How to bid construction jobs: qualify it, price off your own take-off, say what isn't carried, then send it so the reader who skipped the walk can say yes.
How to hire a fractional CTO or fractional CMO: nine questions that separate a seat accountable for the number from a retainer wearing the title.
A fractional CMO, a marketing agency, or a full-time hire: three ways to fill the seat that owns the number, and what each one will never tell you.
A fractional CTO's week for a builder: read the bills, fix the plumbing nobody sees, own the keys, then build the bid and the portal.
What a fractional CMO does for a construction company in 90 days: attribution, spam filtering, the channel that sells, and the one-page kill list.
What a fractional CTO/CMO builds for builders doing $2M to $20M: the technology and marketing department they never had, and what it did in 90 days.
Construction proposal software has been around a decade and 96% of GCs still show no sign of it. What the software can't do, and what a built bid does.
Construction company branding is how you introduce yourself to the decision-maker who never walked the lot. A five-touchpoint test you can run this week.
A marketing plan for a construction company that runs in build order: systems, then scale, then optimization. One quarter per layer, one number per layer.
I ran the same eleven checks on 785 general contractor websites. Most pass as brochures. Most fail at the jobs a contractor website is actually for.
We diagnosed 785 US general contractor websites. Construction marketing isn't failing because the sites are broken. Two systems are missing from 19 in 20.
What an AI-native shop actually is: one operator, a fleet of agents, a verification gate at every step. And what the machines still can't do.
What Revenue Rx built for a Cape Cod custom builder: owner portals, one clean data system, an outreach engine, and $6.7M of qualified pipeline working in the CRM.
Five vendors, five reports, flat revenue. What's missing isn't another retainer. It's one person accountable for the whole number.
Example · What the notes are about
Every post here is downstream of work like this — a bid that stopped being a PDF, a CRM that stopped losing leads, an office that learned to run its own machine.
If you would rather look than read, start with this and come back to the notes after.
